Send your application and attachments via our online service. You can also keep track of the processing of your application in the online service.
Go to the online service
Eligible costs
Business Finland awards grants only for activities taking place after the application has been submitted.
Eligible costs include the following costs related to the project:
- Salaries and wages
- Indirect personnel costs
- External purchased services
- Materials and supplies
- Equipment purchases, depreciation, and rentals
The entities the innovation aid relates to must be separated from the rest of the construction project. The development activities which the innovation aid has been granted for must have their own cost center and job number assigned, and you must keep records of the development activities during the project. If your company is liable to pay VAT, VAT related to costs is not included in acceptable costs. Costs based on an order placed before the start of the period cannot be allocated to the project except when the order includes a cancellation clause linked to the start of the project.
Eligible costs for a new type of vessel and offshore structures
- the costs of the development, design, functional design, or detailed design of the product concept
- the costs of studies, testing, and designs and other similar costs incurred by
- the development and design of the vessel
- the costs of design and design implementation as well as product testing and experimentation
- increased staff and overhead costs of the implementation of technical innovations, limited to the minimum necessary.
The costs referred to in paragraphs 1 to 3 above that are comparable to the conventional ship design of a previous vessel type are not eligible costs.
Series-produced vessels/structures
The additional costs arising from the construction of the first vessel of the new vessel type may include the difference between its personnel and indirect personnel costs as well as overhead costs and the corresponding costs of subsequent vessels in the same series (sister vessels).
The costs of the construction of a new type of vessel may only amount to a maximum of 10% if they are necessary for the practical implementation of the technological innovation and are estimated to exceed 3% of the production costs of the sister vessels to be manufactured at a later date.
Eligible costs for new components or systems
The following costs that arise from new components or systems eligible for the innovation aid are eligible to the extent and for the period that the components or systems have been used in the project, provided that they are directly linked to the innovation:
- Planning and development costs
- testing costs and models for the innovative component
- material and equipment costs
- in exceptional cases, the building and installation costs of a new component or system are required for the practical implementation of the innovation, provided that the costs are limited to the minimum necessary.
Eligible costs for new methods
The following costs arising from new methods eligible for innovation aid are eligible to the extent and for the period of time that the methods have been used in the project, provided that they are directly linked to the innovation process:
- planning and development costs
- material and equipment costs
- where appropriate, the costs of testing the new method.